gaz1 Posted December 15, 2007 Author Share Posted December 15, 2007 - 2 bottles of wine. Wow, imagine what you would have got if you bought a million pounds worth. You might have got a christmas pudding too! How many lorry loads is it now mate? 1684 so, far another 120 this morning, you gotta see my drifting skills in a toyota hilux:eyebrows: i so love my job:D Quote Link to comment Share on other sites More sharing options...
colsoop Posted December 15, 2007 Share Posted December 15, 2007 Need any trainees ? Quote Link to comment Share on other sites More sharing options...
The Raven Posted December 15, 2007 Share Posted December 15, 2007 Hahahahha i know! Fuel!!!! Wow how late was i? Do i win something? Quote Link to comment Share on other sites More sharing options...
gaz1 Posted December 15, 2007 Author Share Posted December 15, 2007 Hahahahha i know! Fuel!!!! Wow how late was i? Do i win something? yep a ride in a single, when i get off my arse and start her up:D Quote Link to comment Share on other sites More sharing options...
gaz1 Posted December 15, 2007 Author Share Posted December 15, 2007 Need any trainees ? think your a bit old to learn now mate:p Quote Link to comment Share on other sites More sharing options...
The Raven Posted December 15, 2007 Share Posted December 15, 2007 yep a ride in a single, when i get off my arse and start her up:D YAY! Quote Link to comment Share on other sites More sharing options...
Matt H Posted December 15, 2007 Share Posted December 15, 2007 I dont know, but if your spending neary a million on a temp road, would it be cheaper to air lift the 25 turbines and various equipment to the site? be quicker? Quote Link to comment Share on other sites More sharing options...
AndyT Posted December 15, 2007 Share Posted December 15, 2007 What sort of life span/durability are we talking? Where is this road? (is it straight ) what sort of land are you building it on? Sorry for all the questions, i'm truely interested. Planning your own track Gaz?? Quote Link to comment Share on other sites More sharing options...
Suprash Posted December 16, 2007 Share Posted December 16, 2007 Planning your own track Gaz?? Im intrigued to know now as well...... Quote Link to comment Share on other sites More sharing options...
gaz1 Posted December 16, 2007 Author Share Posted December 16, 2007 I dont know, but if your spending neary a million on a temp road, would it be cheaper to air lift the 25 turbines and various equipment to the site? be quicker? if only it was that easy:) each turbine base will be 300 cubic metres of concrete with 50ton of reinforcing in it, and that is built on top of the 24x 30 metre, 600mm diametre piles that we drill then concrete, so at 1500 ton and 32 metres into the ground theres the answer;) Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.