Morning guys Im after a some advice from the builders on here as how much hardcore i need to put down for my new shed concrete base.
My old shed was 8x6 and sat on uneven paving slabs, my new one is going to be 14x10ft. I have dug away 2'' of soil whacker plated the grond then built a frame out of 8x2 joists the concrete slab will be the top of the joist so there will be a step up into the shed of about 5'' when finished.
How much hardcore (MOT) should I be putting in and obviously the rest will be concrete, I have started smashing up the old paving slabs and i have about 50 brick left over from some work I had done which will get a smashed up and chucked in.
Thanks