Right what a busy day!
Today Steve, stuart, wes and myself test fitted the engine into a couple of position to find the best suited mounting point. Finding the right point ment that the sump had to miss the lower subframe and the crank pulley missed the steering rack... After an hour of trial and error we finally found the point which worked best.
This is before using the stock mounts
This is using the new mounts
Steve cracked on straight away with making up some quick engine mounts which would hold the engine. We then ensured the engine was centered and made up a temporary gearbox mount using some pipe to ensure that with the gearbox would line up with the diff and the prop was straight. An hour later we finally had the position of the engine sorted and fixed everything in place ready for some permanent mounts to be made on the engine. The gearbox we cant make a permanent mount for just yet as the rest of the floor is coming out and then a t45 frame will be made for the floor and the gearbox tunnel.
While everything was solid we also cut the prop to the right length so it could be sent of to be properly welded and balanced. Its abit long now
Here is everything mocked up
The scuttle was also cut out to make taking the engine out easier and will also be made removable when all done for easy access when changing the plugs etc.
Im away mapping now for the next week but hopefully will be back on the car next weekend.
Enjoy